Wind Turbine Profit Calculator
Estimate annual energy output, revenue, and payback period for a wind turbine from its capacity, average wind speed, electricity rate, and install cost.
Wind Turbine Profit Calculator
Calculator
Adjust values & calculateEnter your values below. Every result is computed in your browser — no data is sent to any server.
Formula: AEP = Capacity × CF × 8760 | CF ≈ 0.087V - V_cutin correction
Worked example — CF 34.2% | 29,959 kWh/yr | $3,595/yr revenue
Formula
AEP = Capacity × CF × 8760 | CF ≈ 0.087V - V_cutin correction
Annual Energy Production depends on capacity factor (CF), which rises with wind speed. CF typically 20-45% for small turbines. Payback = cost / annual revenue.
Worked Examples
Example 1: 10kW home turbine
Problem:10kW, 6 m/s wind, $0.12/kWh
Solution:CF = 0.087 × 6 − 0.18 = 0.342, i.e. 34.2% AEP = 10 × 0.342 × 8,760 = 29,959 kWh Revenue = 29,959 × $0.12 = $3,595/yr
Result:CF 34.2% | 29,959 kWh/yr | $3,595/yr revenue
Frequently Asked Questions
What capacity factor is realistic?
Small residential turbines: 15-30%. Large onshore: 25-45%. Offshore: 35-55%. Higher wind speeds = higher capacity factor.
How does average wind speed translate to actual energy production?
Wind power scales with the cube of wind speed — doubling wind speed increases power by 8 times. A site averaging 7 m/s produces roughly 3-4 times the annual energy of a 4 m/s site with the same turbine. Wind resource assessments typically use the Weibull distribution to model wind speed variability. Sites with minimum average wind speeds of 5-6 m/s are generally considered viable for commercial-scale turbines.
What are the main costs besides the turbine installation?
Beyond the turbine and its installation, a project carries grid connection or interconnection work, ongoing operation and maintenance, land lease or landowner royalty payments where the site is not owned, insurance, and eventual decommissioning and site restoration. Interconnection is the least predictable of these because it is quoted per project by the utility and scales with the distance to a suitable line, the voltage of the connection point and any network reinforcement the utility requires, so a remote rural site can face a bill many times that of one beside an existing three-phase feeder. Maintenance is usually budgeted as a percentage of capital cost per year, and lease terms are negotiated per site as a fixed annual payment, a share of revenue, or a combination. Permitting, noise and shadow-flicker studies and environmental assessment add further cost before anything is built. Get written quotes for interconnection and a signed lease term before relying on the payback figure this tool reports.
Are there government incentives for wind turbine installations?
In the United States the two federal mechanisms are the Production Tax Credit, paid per kilowatt-hour generated during the first ten years of operation, and the Investment Tax Credit, a one-time credit against a share of capital cost, and a project elects one or the other rather than both. The PTC rate is indexed to inflation and republished by the IRS each year, and both credits carry bonus adders tied to prevailing wage and apprenticeship rules, domestic content and siting in designated energy communities, so any cent-per-kWh or percentage figure you see quoted is specific to a filing year and a qualification status. Rural and agricultural projects can also apply to the USDA Rural Energy for America Program for grants and loan guarantees, with the funded share and ceiling set per program year. State-level support adds net metering rules and renewable portfolio standards. Check the current IRS and USDA figures for the year you would place the project in service before putting an incentive into a payback model.
Why is annual energy production calculated by multiplying capacity by 8,760?
8,760 is simply the number of hours in a non-leap year, 24 multiplied by 365, so nameplate capacity times 8,760 gives the energy a turbine would produce running flat out every hour. No machine does that, because wind is intermittent and the rotor idles in calms and shuts down in gales. Capacity factor is the fraction of that theoretical maximum actually delivered, which is why AEP = capacity × CF × 8,760.
How does hub height change the wind speed a turbine actually sees?
Friction with the surface slows the lowest layers of the atmosphere, so mean wind speed increases with height along a profile usually modelled by the power law v₂ = v₁ × (h₂/h₁)^α. The shear exponent α is near 0.14 over open flat terrain and substantially higher over trees or buildings. Because power scales with the cube of speed, adding tower height often lifts annual output far more than the extra steel costs.
What do cut-in, rated and cut-out wind speeds mean?
Cut-in is the speed at which the rotor first produces useful power, commonly around 3 to 4 m/s. Rated speed is where the turbine first reaches nameplate output, typically in the low to mid teens in m/s; above it the controller pitches the blades to hold power flat. Cut-out is where the machine shuts down to protect itself, often near 25 m/s. An annual mean alone says nothing about how many hours land inside that window.
What is the Betz limit, and why can no turbine capture all the wind's energy?
The kinetic power crossing a rotor is P = ½ρAv³, with ρ the air density and A the swept area. Betz's law shows that an open-flow rotor can extract at most 16/27 of it, about 59.3 percent, because extracting more would bring the air to a standstill and block the flow behind the disc. Working rotors reach a power coefficient around 0.35 to 0.45, and gearbox, generator and converter losses reduce delivered output further.
What is the difference between simple payback and levelised cost of energy?
Simple payback, the figure reported here, divides installed cost by first-year revenue and ignores the time value of money, maintenance, performance degradation and eventual decommissioning. Levelised cost of energy divides discounted lifetime cost by discounted lifetime generation to give a dollars-per-megawatt-hour figure that is comparable across technologies. Lenders and developers underwrite projects on LCOE and full cash-flow models, so treat payback here as a screening number only.
Should I value output at my retail electricity rate or at a wholesale price?
It depends on where each kilowatt-hour goes. Generation consumed on site displaces power you would otherwise buy, so it is worth the full retail rate including delivery charges. Surplus exported to the grid is normally credited at a lower export or avoided-cost rate unless a net metering arrangement credits it one for one. Utility-scale projects instead sell under a power purchase agreement at a contracted per-megawatt-hour price well below retail.
References
Background & Theory
History
Reviewed for accuracy by Daniel Agrici, Founder & Lead Developer · Editorial policy
Related Calculators
🧮Wind Turbine Calculator
Calculate wind turbine with inputs, formulas, and instant results.
🧮Wind Capacity Factor Calculator
Calculate wind capacity factor with inputs, formulas, and instant results.
🧮Environmental ROI Calculator
Calculate environmental roicalculator with inputs, formulas, and instant results.
🧮Environmental Data Quality Score Calculator
Calculate environmental data quality score with inputs, formulas, and instant results.
🧮Bag Footprint Calculator
Calculate bag footprint with inputs, formulas, and instant results.
🧮Christmas Tree Footprint Calculator
Calculate christmas tree footprint with inputs, formulas, and instant results.
🧮Co2breathing Emission Calculator
Calculate co2breathing emission with inputs, formulas, and instant results.
🧮Commute Footprint Calculator
Calculate commute footprint with inputs, formulas, and instant results.